Table of Contents

Jaipur Metro Rail: Complete Guide 2026 – Routes, Fares, Timings, Jobs, Latest Updates, Facts & FAQs

Jaipur Metro Rail, which is managed by Jaipur Metro Rail Corporation Limited (JMRC), is the rapid transit network for the city. Being the 6th metro system in India, it is one of the quickest metros that have ever been constructed. Its construction involves an integration of advanced technology and cultural architecture, thereby alleviating traffic conditions.

Jaipur Metro History and Description

Construction for Phase I-A from Mansarovar to Chandpole commenced in the year 2010. The operational service was launched on 3rd June 2015. Phase I-B (the underground stretch towards Badi Chaupar) was completed on 23rd September 2020. The metro comprises elevated and underground stretches. It should be noted that this metro is the first one to operate on the double-storey road and rail route in India.

JMRC Key Stats (as of 2026):

  • Name of Operational Line: Pink Line (East-West Corridor) is the operational line in Jaipur Metro
  • Operational Length of Jaipur Metro: Operational Length of jaipur metro rail~12 km
  • No. of Stations: There are 11 fully functional stations 11
  • Approximate Daily Ridership: Around 55,000–60,000 passengers travels daily in jaipur metro
  • Metro Train Configuration: there are 4-coach trains.
  • Gauge: Standard 1435 mm
  • Power supply: 25 kV AC overhead

 

Jaipur Metro Rail FAQs

Picture of Kumari Ankita
Kumari Ankita
Kumari Ankita is a passionate professional at Tulipshree Infotech, specializing in innovative digital solutions and creative strategies. With a keen eye for technology and business growth, she is dedicated to delivering impactful results and helping brands build a strong online presence through modern, user-focused approaches.

Leave a Reply

Your email address will not be published. Required fields are marked *